My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-26_REPORT - M1975009
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1975009
>
2007-09-26_REPORT - M1975009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:39:24 AM
Creation date
11/27/2007 9:02:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1975009
IBM Index Class Name
Report
Doc Date
9/26/2007
Doc Name
Annual Fee/Report/Map
From
Lakewood Brick & Tile Company
To
DRMS
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PF :r QfrC <br />Notice of Intent to Continue Mining Operations <br />110 (2) Annual a ort <br />Permittee Name: Lakewood Brick and Tile CO. RECEIVED <br />Permit No.: M-1975-009 ~/ SEP 2 6 2007 <br />Operation Name: Doughty's Pit <br />Anniversary Date: September 30, 2007 uwuw~, ... „",~amation, <br />Total: $323.00 (Due on your Anniversary Date) Mining and Safety ~ <br />1. a. Permitted acreage: 5.00 b. County where mine is located: Jefferson <br />2. Has your mine been grated a TEMPORARY CESSATION STATUS? YES NO <br />Does your mine operate MORE or LESS than 180 days per year MORE LESS <br />Do you extract MORE or LESS than 70,000 tons of mineral or <br />overburden a year? MORE LESS <br />3. Do you have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* 0.81 <br />5. Total acres reclaimed for the report year:* 0.00 <br />6. Total acres in various stage of reclamation:' 0.00 <br />a. Backfilled: NA d. Topsoil Replaced: NA <br />Average topsoil thickness <br />b. Graded: NA replaced: NA <br />c. Seeded: NA <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic materials or soil conditioners used for <br />the report year:" NA <br />8. Estimated total acres to be affected in the next report year:' No new area <br />9. COMMENTS: This is a slow developing mine and mining has continued in <br />areas disturbed in past years in the southern mining area. No new area <br />will be disturbed since very little material is removed each year. No <br />reclamation is required at this time. Please see the 2005 annual report <br />map for location of areas discussed below. See Dale 2 <br />' Please show the location of the acreage for items 4 - 6 on your map. Indicate the phases of <br />the reclamation which have been completed, correlated with your timetable. <br />** NOTE: If there have been any changes since the last annual report and you previously submitted <br />a map which correctly depicts the current creage in items 2 through 6, then a new map is <br />unnecessary. However, y u must to th' fact above. <br />Signature: Date: ~ ~c~ D <br />Please type or prin urrent c tact nam addr ss and phone number below: <br />Contact Name: Thomas Murray Phone: (303 238-5313 <br />Company: Lakewood Brick and Tile Co. <br />Address: 1325 Jay Street <br />Denver. CO 80125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.