My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP41361
DRMS
>
Back File Migration
>
Report
>
REP41361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:43:14 AM
Creation date
11/27/2007 9:00:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
Report
Doc Date
1/22/1996
Doc Name
BULLDOG PROJECT-FOLLOWUP TO FIELD INSPECTION OF 9-29-95
From
HOMESTAKE MINING CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fl~~i 1~ AKE <br />~II ~I~~I~~I~~~~~~I~ <br />ALAN D. COX <br />CORPORATE MANAGER-GOVERNMENT AFFAIRS <br />January 15, 1996 <br />State of Colorado <br />Division of Minerals and Geology <br />1474 Main Ave. Room 223 <br />Durango, CO 81301 <br />Attn: Mr. Steve Shuey <br />U~IVbER <br />OF"FICA <br />RE: Bul/doQ Proiect - Fo!lorvup to Field Inspection o(9/29/95 <br />Reclamation Permit # M-77-215 <br />Dear Mr Shuey: <br />Received <br />JAN ~ ? ;_>~~:; <br />DurBrtgp 1^rF!d Crtltap <br />n of 1.-sa;a ~D 5 >at, <br />This letter is intended to provide an update to our field response activities that were initiated as a <br />result of ourjoint field inspection of the property on September 29, 1995. As you will recall, <br />three issues were identified as a result of the field inspection and included: 1) repair of a small <br />sloughed cave-in area above the back of the 9700 portal entry area, 2) reworking and <br />realignment of the east diversion ditch outlet structure for the lower tailings pond, and 3) <br />control of the Canadian thistle on the west side of the upper tailings pond. <br />Items # I and 3 above will be addressed during the 1996 field season as conditions allow and at <br />the time of effective weed control efforts. Reworking of the east diversion ditch was completed <br />last Fall at the lower tailing pond. The attached photo documentation indicates the work that <br />was completed and the newly constructed rip-rap channel that was constructed to handle runoff <br />diversion flows. The re-configured ditch now directs all potential runoff water into the <br />permanent spillway and thence exits through the spillway structure to the natural drainageway on <br />the east side of the dam. The rip-rap channel is designed and sized similar to the remainder of <br />the ditchline to insure that design flows are accommodated <br />if you have any questions regarding the work completed to date, or the planned work for the 1996 <br />field season, please contact me at your earliest convenience. <br />Sincerely, <br />~~.~ <.~, <br />~~~ <br />cc' A Sorenson -Colorado DMG. Denver <br />R.R. Cellan <br />Attachments: Photos <br />HOMESTAKE MINING COMPANY <br />650 CALIFORNIA STREET • SAN FRANCISCO ~ LA 9a I OB~YT08 (015) 9618150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.