My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP41276
DRMS
>
Back File Migration
>
Report
>
REP41276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:43:09 AM
Creation date
11/27/2007 8:59:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
12/3/1992
Doc Name
TRANSMITTAL OF BI WEEKLY SAMPLE ANALYSES FROM BATTLE MOUNTAINS SAN LUIS GOLD PROJECT COSTILLA CNTY C
From
BATTLE MOUNTAIN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />999 <br />John C. Halepaska and Associates, Inc. <br />Consulting Ground Water Engineers <br />26 West Dry Creek Circle, Suite 640 <br />Littleton, Colorado 80120 <br />(303) 794-1335 <br />FAX (303) 794-3245 <br />~~~.r~ ~. ,.;. <br />~~; <br />flEG ~ 1992 <br />December 1, 1992 UI1;i5„~, <br />=~INERkI~ t ": ~, , <br />Division of Mining and Geology <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Attn: Mr. Larry Oehler <br />Reclamation Specialist <br />Subject: Transmittal of Bi-Weekly Sample Analyses From Battle <br />Mountain's San Luis Gold Project, Costilla County, <br />Colorado. <br />Project No. 5284 <br />Dear Mr. Oehler: <br />Transmitted herewith are the analytical reports from Core <br />Laboratories for bi-weekly samples collected between September 30 <br />and November 2, 1992 from required monitoring stations at Battle <br />Mountain's San Luis Gold Project (Appendix A). <br />The samples collected during this time frame were from monitoring <br />wells M-9, M-12 and M-13, and surface water station RS-5, as well <br />as three of the five process points. The sample labeled BFRB is <br />a rinse blank sample. <br />At the time of the sampling event, wells M-2, M-6, M-7 and M-8 were <br />dry. No deviations from the sampling QA/QC protocols were noted <br />for any of these samples. <br />As required by the recently-approved TR-06, Table 1 lists the <br />calculated cyanide values from the process point samples. <br />Calculated free cyanide and WAD Cyanide were based on the methods <br />described by ASCI in its report dated June 1992. <br />
The URL can be used to link to this page
Your browser does not support the video tag.