Laserfiche WebLink
Bowie Resources, LLC Surface Water <br />Bowie No. 2 Mine <br />2006 Annual Hydrology Report C-2 • <br />North Fork -Drainage System <br />Elevation - 5930 <br />Initiated 6/2912000 6/29/2000 6/29/2000 6/29/2000 <br />Activated <br />Date 11/1/2006 8/10/2006 6/22/2008 5/2/2006 <br />Summary Information <br /> Baseline Operetion <br />UNITS Min Ave Max Min Ave Max <br />Flow GPM 0 0 0 0 0 0 0 0 0 0 <br />FieldComment Dry Dry Dry Dry <br />h su <br />Conductivity umhos/cm <br />Temperature Celsius <br /> UNITS <br />Bicarbonate mg/L <br />Chloride mg/L <br />Conductivity umhos/cm <br />Hardness mg/L <br />Nitrate-Nitrite mg/L <br />Oil and Grease m /L <br />pH su <br />Phosphate mg/L <br />ResitlueFilterable (TDS) mg/L <br />ResidueNOnFilterable TSS) mg/L <br />SAR <br />Sulfate m 2 <br />Aluminum mg/L <br />Arsenic mg/L <br />Cadmium mg/L <br />Calcium m /L <br />Co er m /L <br />Iron (Total) mg/L <br />Lead mg/L <br />Magnesium mglL <br />Manganese otal mg/L <br />Mercu /L <br />Molyebtlenum mg/L <br />Selenium mg/L <br />Sodium mg/L <br />Zinc mg/L <br />The area of concern for monitoring point C-2 has not been affected by the mining operation. Therefore, all recorded <br />monitoring events an; considered Baseline. <br />The C-2 monitoring point is a culvert under the Union Pacific Railread. It is located 2440 feet northeast of the C-1 culvert. <br />Baseline Inormation Collection initialetl on 6/29/00 and not yet considered complete. <br />Paint C-2 has not been inFluenced by mining. <br />I <br />• <br />Figure No. 86 <br />