Laserfiche WebLink
Bowie Resources, LLC Surface Water <br />Bowie No. 2 Mine <br />2006 Annual Hydrology Report TC-up <br />Terror Creek -Drainage System <br />Elevation - 7080 <br />Initialed 9/30/1996 9/30/1998 9/30/1996 9/30/1996 <br />Activated <br />Date 11/27/2006 9/20/2006 6/14/2006 4/13/2006 <br />Summary Information <br />Baseline Operation <br />UNITS Min Ave Max Min Ave Max <br />Flow CFS 0.0 5.7 44.1 0.6 0.1 2.5 18.1 <br />Water Level in Flume Feet 0.00 0.40 1.90 0.12 0.05 0.31 1.08 <br />FieltlComment <br />ph su 7.2 8.2 8.8 8.4 8.2 8.3 8.2 <br />Conductivity umhos/cm 40 98 180 110 120 9D 50 <br />Tem erature Celsius 0.2 8.1 19.2 0.8 7.6 16.4 7.3 <br />DO mg/L 0.0 5.7 11.1 11.1 6.5 7.3 8.6 <br />The monitoring point location (or Upper Terror Creek is located on Tenor Creekjust above [he con%uence of Termr Creek and West Terror <br />Creek. It is accessed by the Terror Creek road by permission thmu9h locked gates. This point is referred to in the Bowie No. 1 Annual <br />Hydmbgy Report as S W02. <br />Baseline Information Collection initiated on 9/30/96 and not yet considered wmplete. <br />Point TC-up has not been inFluencetl by mining. <br />Figure No. 129 <br />The area of rroncem for monitoring point TC-up has riot been a%eded by the mining operation. There/ore, a1/ recoMed <br />monitoring events are consitlered Baseline. <br />