Laserfiche WebLink
Bowie Resources, LLC <br />Bowie No.2 Mine <br />• 2006 Annual Hydrology Report B-Gulch-up <br />Drainage System <br />Elevation - 7080 <br />Surface Water <br />Initiated 2/28/1995 2/28/1995 2/26/1995 2/28/1995 <br />Activated 3/30/1997 3/30/1997 3/30/1997 3/30/1997 <br />Date 11120/2006 9118/2006 6/13/2006 3/26/2006 <br />Summary Information <br />Baseline Operation <br />WITS Min Ave Max Min Ave Max <br />Flow GPM 0 0 0 0 0 0 0 0 0 0 <br />FieltlCamment No Flow No Flow Nc Flow No Flow <br />h su <br />Conducliviry umhas/cm <br />Temperature Celsius <br />The UpperB Gulch monitoring point is located approximately 1000'southwest o/the Bowie No. 2 Mine portals, outside o/the <br />disturted area boundary. <br />J <br />Baseline Information for B-Gulch-up is derivetl from events beginning on 2/28/95 through 3!30/97. <br />Point influencetl by mining on 3/30/97. <br />Figure No. 84 <br />