Laserfiche WebLink
Bowie Resources, LLC Surtace Water <br />Bowie No. 2 Mine <br />2006 Annual Hydrology Report FMC-up • <br />Canal -Fire Mountain Canal <br />Elevation - 5960' <br />Initiated 5/19/1999 5/19/1999 5/19!1999 <br />Activated 5/19/1999 5/19/1999 5/19/1999 <br />Date 9/12/2006 7/24/2008 5/24/2006 <br />Summary Information <br />Baseline Operation <br />UNITS Min Ave Max Min Ave Max <br />Flow CFS 0.00 120.08 180.01 185 169 171 <br />FieldComment <br />h su 7.1 8.2 8.8 8.5 8.6 7,1 <br />Conductivi umhos/cm 40 125 290 190 130 70 <br />Temperature Celsius 6.5 11.5 18.6 18.0 18.6 8.1 <br />DO mg/L 0.0 6.2 11.2 8 8.7 9.7 <br /> <br />all recorded moniroring events are cronsidered operetional. <br />Tha upper monirodn point for Me Fire Mountain Canal is located where the ditch crosses Hubbard Creek. <br />Fbw data is received from Fire Mountain Canal records (Merritt Dennison 970-527-4385). <br />G <br />There is no baseline collection possible for points initiated alter the inFlUence of mining. <br />Figure No. 112 <br />The area of concern for monirodng point FMC-up was aHec[ed by the mining operab~on before its establishment. Therefore, <br />