Laserfiche WebLink
Bowie Resources,LLC Surtace Water <br />Bowie No. 2 Mine <br />2006 Annual Hydrology Report D34-13 • <br />Dove Gulch -Drainage System <br />Elevation - 6440 <br />Initiatetl 10/31/1997 10/31/1997 10/31/1997 10!31/1997 <br />Activatetl <br />Date 11/112008 8/10/2006 6/22/2008 411912008 <br />Summary Information <br />Baseline Operation <br />UNITS Min Ave Max Min Ave Max <br />Flow GPM 0.00 0.00 0.00 0 0 0 0 <br />FieldComment Dry D Dry Dry <br />h su <br />Conductivity umhos/cm <br />Temperature Celsius <br /> <br />The location for D34-13 is at the bwer extreme of Dove Gulch, abng the wesfem edge of Hubbard Creek Trail. <br /> <br />Baseline Information Collection initiated on 10/31/97 and not yet considered complete. <br />Point D34-13 has not been influenced by mining. <br />Figure No. 100 <br />The area o/ mncem for monitoring pointD34-13 has riot been affected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />