My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP41080
DRMS
>
Back File Migration
>
Report
>
REP41080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:42:59 AM
Creation date
11/27/2007 8:55:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
3/8/2000
Doc Name
ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 3=-3?-I 16(3), and C.R.S. 34-3'_.~-I 16(3)iar. on the anniversary data of the permit each year. <br />the operator shall submit a report and a map sho~'ing the extent of current disturbances u, affected land, <br />reclamation accomplished ro date and during the preceding year, new disturbunceti that arc anticipated to occur <br />iluring the upcomin_ year, and reclamation that will he performed durinti the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled m;ip that clearly delineates and includes- <br />the above elements may suffice for a written report.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you muss. <br />provide with the Annual Report the followin_ information as required by ?CCR 407-1.407-1, and Rules <br />1.13.7(1 ua): <br />(i) the condition of [he operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation. performance <br />standards and Environmental Protection Plan requirements, if they are part of your approved application; and <br />(iii) plans fur resumption of mining operations. <br />Please provide [he additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of ?CCR 407-I, 407-4, and Rules I.15(I ), proeide an updated statement <br />regarding the sufficiency of [he value of the Financial Warranty, specifically: <br />(i) Per the requirements of 2 CCR 407-I, 407-4, and Rules I . I i(1)(a}. provide an updated <br />statement regardinti the sufficiency of the value of [he financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance. salvage <br />credit, and first prioriq~ liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules L l5(I)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicatinti any chanties in propetty value. and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement. <br />and the value of the property subject to either of these instruments. The repots shall also provide <br />proof that there are no past-due property [axes. <br />(i) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.71 ;), permits secured with an <br />Irrevocable Letter of Credit. [he operator shall have the bank provide documentation in the form <br />of a balance sheet, cenified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does not exceed ten percent (10%) of the bank's capital surplus accounts. <br />(ii) Per the requirements of ?CCR 407-1, 407-4, and Rules -1.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Egwpmen[, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(I)(c). all monitoring information <br />required as patt of the approved permit application, to include the Environmental Protection Plan. i Please <br />note that if you are no[ a Designated Mining Operation. you will not have an Environmental Protection <br />Plan as part of your approved permit.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.