Laserfiche WebLink
<br /> <br />(2) The additional monitoring portion of this report consists of <br />three separate sections; a discussion of the results of an <br />annual rill and gully inspection, an evaluation of <br />revegetation success, and a report on the hydrologic status of <br />the Bourg Mine which underwent final reclamation during the <br />Fall of 1988. <br />Rill and Gully Inspection <br />A rill and gully inspection was conducted at the Bourg <br />property on October 6, 1993. At that time it was noted <br />that the sediment control system has worked as designed. <br />All terraces were found to be in good condition. No new <br />reportable rills or gullies were located. Flatiron <br />Companies continues to monitor two previously reported <br />rills, 1990, both of which have been stablized. <br />The settlement crack located at the bottom of the slope <br />at the north end of the property has been filled with <br />topsoil. Flatiron Companies will continue to monitor the <br />crack for further settlement. <br />Vegetation Survey <br />The vegetation survey was conducted by Warren Keammerer, <br />Ph.d. on August 17, 1993. The results of that survey are <br />attached as Appendix A. It is Flatiron Companies' <br />assessment that the revegetation effort is continuing to <br />progress well. <br />Hydrologic Survey <br />Well depths were measured and water samples were <br />collected on May 27 and October 4, 1993, The results of <br />those samples are attached (Appendix B). There is no <br />indication that the reclamation activities at the Bourg <br />Mine have had any adverse impact on the hydrology of the <br />area. <br />2 <br />