<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />According to C.R.S. 34-32-116(3),
<br />the operator shall submit a rt:pon ar
<br />reclamation accomplished to date a~
<br />during the upcoming yeaz, and rec1~
<br />a report and map to enclosed annua
<br />the above elements may suffice for
<br />nd C.R.S. 34-32.5-116(3)(a), on the anniversary date of the permit each year,
<br />f a map showing the extent of current disturbances to affected land,
<br />~ during the preceding yeaz, new disturbances that are anticipated to occur
<br />nation that will be performed during the upcoming year. Please attach such
<br />report form. (An adequately labeled map that clearly delineates and includes
<br />written report.)
<br />If your operation is subject to the pr visions of Temporary Cessation as defined in the Act and Rules, you must
<br />provide: with the Annual Report the following informaton as required by 2 CCR 407-1, 407-4, and Rules
<br />1.13.7(1)(a):
<br />(I) the condition of the
<br />(ii) what specific measure:
<br />performance standards and
<br />approved application; and
<br />(iii) plans for resumption o
<br />Please provide the additional
<br />(a) Per the requirements
<br />regazding the sufficiency
<br />at the time of cessation;
<br />been and will be implemented to comply with reclamation,
<br />onmental Protection Plan requirements, if they are part of your
<br />operations.
<br />information with your Annual Report, as applicable:
<br />2 CCR 407-1, 407, and Rules 1.15(1), provide an updated statement
<br />the value of the Financial Wananry, specifically:
<br />(I) Per the require ents of 2 CCR 407-1, 407.4, and Rules 1.15(1)(a), provide an updated
<br />statement regazdin the sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letters f credit, Deeds of Trust, and security agreements, self-insurance, salvage
<br />credit, and first pri rity liens on project related fixtures.
<br />(ii) Per the require ents of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a
<br />Deed of Tmst or a ecurity Agreement, the operator shall submit an update, by a qualified
<br />independent apprai er, indicating any changes in property value, and a statement summarizing
<br />any circumstances hich may affect the adequacy of the Deed of Trust, or Security Agreement,
<br />and the value of th property subject to either of these instruments.
<br />The report shall als provide proof that there are no past~ue properly taxes.
<br />(iii) Per the require ents of 2 CCR 407-1, 407, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter f Credit, the operator shall have the bank provide documentation in the form
<br />' of a balance sheet, ertified by a Certified Public Accountant, demonstrating that the
<br />Letter of Credit d snot exceed ten percent (10%) of the bank's capital surplus accounts.
<br />i
<br />(vi) Per the requi menu of 2 CCR 407-1, 407=1, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien on an fixtures and Equipment, the operator shall provide a report in sufficient
<br />detail to ful:y desc be the condition, value, and location of all pledged fixtures
<br />and equipment.
<br />' (b) Per the requirements of CCR 407-1.407-4, and Rules ].15(1)(c), all monitoring information
<br />required as pan of the appr ved permit application, to include the Environmental Protection Plan.
<br />(Please note that if }~ou are of a Designated Mining Operation, you will not have an Environmental
<br />Protection Plan as part of y ur approved permit.)
<br />
|