Laserfiche WebLink
<br />ANNUAL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 34-32-116(3), <br />the operator shall submit a rt:pon ar <br />reclamation accomplished to date a~ <br />during the upcoming yeaz, and rec1~ <br />a report and map to enclosed annua <br />the above elements may suffice for <br />nd C.R.S. 34-32.5-116(3)(a), on the anniversary date of the permit each year, <br />f a map showing the extent of current disturbances to affected land, <br />~ during the preceding yeaz, new disturbances that are anticipated to occur <br />nation that will be performed during the upcoming year. Please attach such <br />report form. (An adequately labeled map that clearly delineates and includes <br />written report.) <br />If your operation is subject to the pr visions of Temporary Cessation as defined in the Act and Rules, you must <br />provide: with the Annual Report the following informaton as required by 2 CCR 407-1, 407-4, and Rules <br />1.13.7(1)(a): <br />(I) the condition of the <br />(ii) what specific measure: <br />performance standards and <br />approved application; and <br />(iii) plans for resumption o <br />Please provide the additional <br />(a) Per the requirements <br />regazding the sufficiency <br />at the time of cessation; <br />been and will be implemented to comply with reclamation, <br />onmental Protection Plan requirements, if they are part of your <br />operations. <br />information with your Annual Report, as applicable: <br />2 CCR 407-1, 407, and Rules 1.15(1), provide an updated statement <br />the value of the Financial Wananry, specifically: <br />(I) Per the require ents of 2 CCR 407-1, 407.4, and Rules 1.15(1)(a), provide an updated <br />statement regazdin the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters f credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first pri rity liens on project related fixtures. <br />(ii) Per the require ents of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a <br />Deed of Tmst or a ecurity Agreement, the operator shall submit an update, by a qualified <br />independent apprai er, indicating any changes in property value, and a statement summarizing <br />any circumstances hich may affect the adequacy of the Deed of Trust, or Security Agreement, <br />and the value of th property subject to either of these instruments. <br />The report shall als provide proof that there are no past~ue properly taxes. <br />(iii) Per the require ents of 2 CCR 407-1, 407, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter f Credit, the operator shall have the bank provide documentation in the form <br />' of a balance sheet, ertified by a Certified Public Accountant, demonstrating that the <br />Letter of Credit d snot exceed ten percent (10%) of the bank's capital surplus accounts. <br />i <br />(vi) Per the requi menu of 2 CCR 407-1, 407=1, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on an fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to ful:y desc be the condition, value, and location of all pledged fixtures <br />and equipment. <br />' (b) Per the requirements of CCR 407-1.407-4, and Rules ].15(1)(c), all monitoring information <br />required as pan of the appr ved permit application, to include the Environmental Protection Plan. <br />(Please note that if }~ou are of a Designated Mining Operation, you will not have an Environmental <br />Protection Plan as part of y ur approved permit.) <br />