My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP40887
DRMS
>
Back File Migration
>
Report
>
REP40887
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:42:49 AM
Creation date
11/27/2007 8:52:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Report
Doc Date
12/11/2001
Doc Name
1996 AHR & ARR Reclamation Report
Annual Report Year
1996
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• MASS BALANCE EVALUATION <br />CEC disposed of 51,158 tons (measured) of mixed fly ash and bottom ash, obtained <br />from the Coors Brewing Company/Trigen Colorado Energy Corporation facility (see <br />Ash Disposal Data) in the south end of B-Pit and in A-Pit using approximately 14,000 <br />bank cubic yards ~ (BCY) of overburden material to cover the disposal areas locally, <br />and to control dust and fugitive debris in the immediate areas of the pits. Again, <br />relatively small amounts of overburden materials were excavated from the long-term <br />spoil area. Approximately 50,000 BCY of topsand was moved to complete the <br />reclamation of a portion of the A-Pit haul road in order that this area could <br />accommodate seeding activity. <br />Remaining B-Pit Airspace Volume 1,801,500 BCY <br />(to proposed final reclamation contours) <br />Remaining A-Pit Airspace Volume 169,200 BCY <br />(to proposed final reclamation contours) <br />• Excess Long-term Spoil Remaining On Site 353,000 BCY <br />Topsand Stockpiled On Site 470,000 BCY <br />A noted variation in the A-Pit airspace volumes (1994 to 1996 AHR <br />reports) results from the use of the 1986 reclamation plan to compute the <br />1994 airspace volume, whereas the 1996 calculation relies on the <br />currently-suggested plans for final reclamation contour and drainage <br />plan configurations. <br />cubic yards in-place <br />AFiR-1996 -121- Stipulation # l 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.