Laserfiche WebLink
Bowie Resources Limited <br />Bowie No. 1 Mine <br />2002 Annual Hydrology Report <br />Monitoring Well SM-9 <br />Depth - 40' <br />Top of Pipe Elevation - 7520' <br />Pipe 2.5' Above Ground <br />Ground Water <br />Initiated 8/26/1985 8/26/1985 <br />AMivaled 2/1/1993 211/1993 <br />Date 12/9/2002 6/26/2002 <br /> <br />~R <br />(NITS <br />SM09 <br />Summary Information <br />Baseline Operation <br />Min Ave Max Min Ave Max <br />Static Water Level Feet 19.7 24.9 27.0 17.0 23.7 26,2 25.86 ~ 26.22 <br />Water Elevation Feet 7493.0 7495.8 7520.0 7493.8 7496.3 7503,0 7494.14 7493.78 <br />Temperature Celsius 6.7 9.3 18.1 6.0 8.2 10.3 8.0 9.1 <br />Conductivity umhos/cm 310 680 1190 580 786 980 860 890 <br />pH su 6.7 7.8 8.8 6.9 7.3 7.8 7.1 6.9 <br />Field Comments <br />Shallow monitoring wells SM-1 through SM-11 were constructed in 1985 in order to gather additional information <br />on alluvial/colluvial deposits within fhe permit boundary. They are depicted on Map 4-1. <br />Baseline Information for Point SM09 is derived from events beginning on 8/26/85 through 211/93. <br />Point influenced by mining on 211/93. <br />Monitoring Point Table 17 <br />(Revised 03104) <br />