Laserfiche WebLink
Bowie Resources Limited <br />Bowie No. 7 Mine <br />2002 Annual Hydrology Report <br />SMOt <br />Monitoring Well SM-1 <br />Depth - 55' <br />Top of Pipe Elevation - 7590' <br />Pipe 2.7' Above Ground <br />Ground Water <br />Initiated 8/2/1985 8/2/1985 <br />Activated <br />Date 12/9/2002 6/26/2002 <br /> <br />Summary Information <br /> Baseline Operation <br />UNITS Min Ave Max Min Ave Max <br />Static Water Level Feet 2.1 6.2 22.0 10.13 8.69 <br />Water Elevation Feet 7568.0 7583.8 7587.9 7579.87 7581.31 <br />Temperature Celsius 6.0 9.7 14.7 8.5 10 <br />Conductivity umhos/cm 380 559 761 600 600 <br />pH su 7.2 7.7 8.2 7.4 7.2 <br />Field Comments <br /> UNITS <br />Bicarbonate m /L 290 331 380 299 380 <br />Carbonate mg/L <MDL 0.3 7 <MDL <MDL <br />Chloride mg/L 5 7 16 7 7 <br />Conductivi umhos/cm 580 632 711 640 634 <br />Hardness mg/L 173 263 1113 242 230 <br />pH su 7.3 7.8 8.4 7.6 7.5 <br />ResidueFilterable-TDS m /L 340 374 424 380 400 <br />ResidueNonFilterable-TS m /L <MDL 28 96 10 <MDL <br />SAR 1.44 1.76 3.46 1.56 1.73 <br />Sulfate mg/L 0.3 44.5 84.0 50 50 <br />Calcium (Dissolved) mg/L 46.7 68.6 186.0 70.6 62.80 <br />Magnesium (Dissolved) mg/L 9.0 22.5 158.0 16 17.80 <br />Sodium (Dissolved) mg/L 49.0 65.8 267.0 55 59.70 <br />TDS Ratio (grav./calc.) 0.94 1.01 1.12 1.01 0.94 <br />The area of concern for monitoring point SMOf has not been affected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />Shal/ow monitoring wells SM-1 through SM-11 were constructed in 1985 in order to gather additional information <br />on alluvial/co/luvial deposits within the permit boundary. They are depicted on Map 4-1. <br />Baseline Infonna[ion Collection initiated on 8/2/85 and not yet consideretl complete. <br />Point SM01 has not been influenced by mining. <br />Monitoring Point Table 11 <br />(Revised 03/04) <br />