My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP40756
DRMS
>
Back File Migration
>
Report
>
REP40756
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:38:58 AM
Creation date
11/27/2007 8:50:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Report
Doc Date
2/21/1985
Doc Name
FILE C-047-81 HAUL ROAD CERTIFICATION AND BENCH PROJECT QUARTERLY CERTIFICATION
From
BLUE RIBBON COAL CO
To
MLR
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
blue RECEIV <br />ribbon ED. <br />blue ribbon coal company <br />COQI FEp 71 18 ~ delta,~o b8ado 81416 <br />company MINED LAND (3031 8 74-756 7 <br />Cob. pgpl, °EN~MelResourcesl0t! <br />BLUE RIBBOII MINE Rh:NCH STAriILIZATION QUARTERLY CERTIFIOATION <br />Tltis certification is being done by myself, Larry M. Reschke, the <br />mine engineer For Blue Ribbon Coal Company. I am a registered professional <br />engineer in the State of. Colorado. I was assigned project engineer for the <br />bench construction. As additional preparation for this position I attended a <br />Troxler moisture-density training class. I have had varied experience in dirt <br />work design and inspection at Blue Ribbon Coal Company, Grand Mesa Coal Com- <br />pany and Snowmass Coal Company. Design work :or this project was done by Rocky <br />hlountaiu Gr_otechnical, Inc. (RPIG1 uC Colorado Springs. Their assistance, phone <br />~~ consultation and site inspection, was used Crequentlyin the first [wo months <br />oC constructlon. Jim Stover oC Powderhoen Coal Company, also a registered <br />professional engineer in the State of Colorado, has assisted in inspection since <br />January 2, 1985. <br />This certification is being done to satisfy the requirements of Rule 4.09.1. <br />It covers all work done from 9-7.4-84, when Colorado Ptine Land Reclamation <br />vrrbally approved the pl.ait,t}trougl~ 1-31-85. During that period of time the <br />Following phases oC construction took place: clearing and stripping, <br />surface drainage, toe excavation, back C111i.ng with recpmpacted colluvium, <br />back Cilling with select material, installation of underdrains and coal waste <br />placement. Each o these areas w111 be discussed in detail. <br />Tl~c clearing and stripping started immediately upon approval. Equipment, <br />scrap met:~l, wood and other debris were cleared Irom the site. Trees and bushes <br />within tite proposed disposal area were cleared and burned. The topsoil stockpfile <br />
The URL can be used to link to this page
Your browser does not support the video tag.