Laserfiche WebLink
<br />~t <br /> Bowie No. 2 Mine Subsidence <br /> Hubbard Creek points, May, 2003 <br />LINE-23 <br /> These points are on a steep hillside that shows evidence of past earthslides. <br /> Movement in these points may be due to possible survey error, natural earthslides, <br /> mining activity, or a combination of the three. <br />STA Date Node # Northing Easting Elevation Description <br />Z3-A Nov 2002 1883 32974.71 36813.58 6525.06 REBAR+CAP <br /> May 2003 1944 32974.52 36813.59 6524.97 <br />23-B Nov 2002 1884 32699.51 36979.08 6561.10 REBAR+CAP <br /> May 2003 1945 32699.46 36979.06 6561.10 <br />23-C Nov 2002 1885 32581.72 37160.23 6521.97 REBAR+CAP <br /> May 2003 1946 32581.65 37160.18 6522.02 <br />Chanue in position: November 2002-~ Mav 2003 <br />POINT# SURVEY# <br />Nov 2002-Ma 2003 BEARING DISTANCE ELEV <br />23-A 1883-1944 S 02°21'41" E 0.19 - 0.09 <br />23-B 1884-1945 S 16°35'14" W 0.05 0.00 <br />23-C 1885-1946 S 37°56'00" W 0.09 + 0.05 <br />Between July and November of 2003, Cragg Surveying will conduct 2 more additional surveys <br />of the Hubbard Creek subsidence points <br />If you have any questions, please call. <br />~~~,pG~ ~ ~~~ <br />Stephen B. Cragg <br />4 <br />