Laserfiche WebLink
Snowcap Coal Company, Inc. - 6 - 2004 Annual Reclamation Report <br />18. Cameo Refuse Disposal Area No. 1 - Re-contoured upper bench, <br />regraded the top of the pile, covered all slopes, benches and the top of <br />the pile with 24 inches of material. Established collection ditches and rip- <br />rapped the ditches in accordance with the reclamation plan. This pile was <br />seeded during April 2002. Located in the SE'/<, Section 28, Township 10 <br />South, Range 98 West, 6`" P.M. <br />Area - 14.8 acres <br />Date -April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />19. Cameo Refuse Disposal Area No. 2 -The final reclamation of this refuse <br />pile included covering and topsoiling the upper benches and the top of the <br />pile. Also a new diversion ditch was constructed just above the pile. The <br />Old Upper diversion ditch was reclaimed and restored to approximate <br />original contours and then reseeded. Located in the SE'/<, Section 28 and <br />the SWY<<, Section 27, Township 10 South, Range 98 West, 6`" P.M. <br />Area - 20.2 acres <br />Date -April 2002 for CRDA2 and November 2002 for Upper Diversion <br />Seed Mix -For CRDA2 - "Seed Mix, Table 14-13", Upland Components <br />Seed Mix -For Upper Diversion - "Seed Mix, Table 14-8", Upland <br />Components <br />20. Cameo Borrow Area No. 2 -Material was excavated from CBA2 for the <br />covering of the CRDA1. Approximately 5.1 acres was seed in April 2002, <br />however a further disturbance will be needed here at the removal of Pond <br />11. Located in the SE'/<, Section 28, Township 10 South, Range 98 West, <br />6`" P.M. <br />Area - 2.7 acres <br />Date -April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />21. Access Road and Powerlines to No. 2 West Pontals - By agreement <br />with the Bureau of Land Management, the access road was left in place. <br />The Powerline reclamation was finished during 2002. <br />Area - 3.8 acres <br />Date -July 2002 <br />Seed Mix - No backfilling or seeding required <br />22. Roadside North Portal Mine Facilities and Stockpile Area -All <br />structures, materials and facilities were removed. The portal decline was <br />filled and the area was returned to approximate original contours and then <br />reseeded. Located in the SW'/< Section 27, Township 10 South, Range <br />98 West, 6`" P.M. <br />Area - 24.1 acres <br />Date -November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />