My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP40716
DRMS
>
Back File Migration
>
Report
>
REP40716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:36:43 AM
Creation date
11/27/2007 8:49:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
2/9/2005
Doc Name
2004 Annual Reclamation Report
From
J.E. Stover & Associates Inc
To
DMG
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. - 6 - 2004 Annual Reclamation Report <br />18. Cameo Refuse Disposal Area No. 1 - Re-contoured upper bench, <br />regraded the top of the pile, covered all slopes, benches and the top of <br />the pile with 24 inches of material. Established collection ditches and rip- <br />rapped the ditches in accordance with the reclamation plan. This pile was <br />seeded during April 2002. Located in the SE'/<, Section 28, Township 10 <br />South, Range 98 West, 6`" P.M. <br />Area - 14.8 acres <br />Date -April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />19. Cameo Refuse Disposal Area No. 2 -The final reclamation of this refuse <br />pile included covering and topsoiling the upper benches and the top of the <br />pile. Also a new diversion ditch was constructed just above the pile. The <br />Old Upper diversion ditch was reclaimed and restored to approximate <br />original contours and then reseeded. Located in the SE'/<, Section 28 and <br />the SWY<<, Section 27, Township 10 South, Range 98 West, 6`" P.M. <br />Area - 20.2 acres <br />Date -April 2002 for CRDA2 and November 2002 for Upper Diversion <br />Seed Mix -For CRDA2 - "Seed Mix, Table 14-13", Upland Components <br />Seed Mix -For Upper Diversion - "Seed Mix, Table 14-8", Upland <br />Components <br />20. Cameo Borrow Area No. 2 -Material was excavated from CBA2 for the <br />covering of the CRDA1. Approximately 5.1 acres was seed in April 2002, <br />however a further disturbance will be needed here at the removal of Pond <br />11. Located in the SE'/<, Section 28, Township 10 South, Range 98 West, <br />6`" P.M. <br />Area - 2.7 acres <br />Date -April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />21. Access Road and Powerlines to No. 2 West Pontals - By agreement <br />with the Bureau of Land Management, the access road was left in place. <br />The Powerline reclamation was finished during 2002. <br />Area - 3.8 acres <br />Date -July 2002 <br />Seed Mix - No backfilling or seeding required <br />22. Roadside North Portal Mine Facilities and Stockpile Area -All <br />structures, materials and facilities were removed. The portal decline was <br />filled and the area was returned to approximate original contours and then <br />reseeded. Located in the SW'/< Section 27, Township 10 South, Range <br />98 West, 6`" P.M. <br />Area - 24.1 acres <br />Date -November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />
The URL can be used to link to this page
Your browser does not support the video tag.