~.: • <br />Rich Dumingue <br />-2- March 17, 2982 <br />(4) The operator should be required to complete their analysis and any <br />appropriate design changes as soon as possible. In my opinion, sufficient <br />data should be available to complete an analysis of the proposed solution by <br />the end of May. <br />(5) Following our approval of any modifications necessitated by the <br />additional data collection, the applicant should be required to expeditiously <br />complete whatever installation is determined to be appropriate. The operator <br />should be capable of completing the remedial activity by the end of June. <br />/mt <br />cc: Ed Bischoff <br />Dave Shelton <br />