Laserfiche WebLink
will be put back into production. Activities similar to <br /> those which have occurred will continue to take place until <br /> this time. Surface and underground work will continue to <br /> help improve the ore reserves and the long range mining <br /> plans. Umetco proposes to continue its operations of Bitter <br /> Creek until such ore reserves are mined. At that time the <br /> permitted reclamations plan will be implemented. <br /> Umetco Minerals hereby requests a technical revision to <br /> place the Bitter Creek (M-77-295) in an intermittently <br /> active status as defined by rule 1. 6. 1 (2) (D) . This <br /> classification will best describe the current mode of <br /> operations. <br /> If there are any questions, please give me a call. <br /> Sincerely, <br /> R.E. Marsing <br /> Superintendent of Mines <br />