Laserfiche WebLink
Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2005 <br />Deserado Mine C-1981-018 Blue Mountain Energy, Inc. <br />mine name <br />Address: 3607 CR 65; <br />permit # <br />CO 81648 <br />Permittee <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding {if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Cate o Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total' <br />Acres disturbed 421.54 4.1 425.64 <br />Acres bac~lled and raded 115.83 2.1 117.93 <br />Acres to soiled 115.83 2.1 117.93 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br /> Last Years <br /> Cumulative This Calendar Cumulative 10 years or Greater than <br /> Total ear Total less 10 ears t <br />Acres seeded* 115.83 2.1 117.93 49.21 68.72 <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine. the total number of acres disturbed 425.64 and the total number of acres: <br />Phase I released 0 Phase II released <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z <br />Acreage in active mining areas s 126.45 (Refuse Areas 2/3/4 and 5a) <br />f (exclude acres where Phase III release has been achieved) <br />NA <br />~ Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />wllector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal wnveyors; refuse piles and <br />coal mine waste impoundments; head-of-hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by-products disposal areas). <br />425.64 <br />Phase III released 0 <br />' Includes pits, topsoil stripped areas in advance of pits, and spoil not backflled and graded <br />