My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP40604
DRMS
>
Back File Migration
>
Report
>
REP40604
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:32:39 AM
Creation date
11/27/2007 8:47:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977094
IBM Index Class Name
Report
Doc Date
12/7/1995
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III ~ <br />Notice of Intent to Continue Mining Operations r1Gr l=1\/F17 <br />112 Annual Report DEC 0 7 1995 <br />Permittee Name: Morgan Sand and Gravel <br />Permit No: M-77-094 <br />Operation Name: Westhoff Pit` Division or rvuuera~auueu~cc,. <br />Anniversary Date: 12/20/95 <br />Total: $550.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: ~ b. County where mine is located: <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 160 days per year? MORE ES <br />3. Does this mine have a phased reclamation plan? ES NO <br />i <br />4. Total acres affected during the report year:` ~ GLc1~ <br />l <br />5. Total acres reclaimed for the .report year:' ~ a~c¢_ <br />6. Total acres in various stages of reclamation:' <br />a. Backfilled: d. Topsoil replaced: <br />b. Graded: Average topsoil thickness <br />c. Seeded: replaced: <br />List species seeded & seeding <br />rate for report year on back <br />7 <br />B <br />9. <br />* Please show the location of the acreage for items 4 - 6 on your map". <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />•• NQIE: If there have not been any changes since the-last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, you must state this fact above. <br />Signature: ~'T Date: ,,C~--`7--~.tr <br />Please type or p'rintTcurrent contacQt name, mailing a s, and phone number belo <br />Contact Name: ~i/1/ 7~h1~ Phone: ( ~) $(~-~0~~ <br />Company: ~ ~~ <br />Address: 'f'~,~~ /~~.3 <br />~' CD ~db7a 1 <br />Federal Tax ID No. or Social Security No.: ~~ 06~ /~ ~6~ <br />The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:' ~, yyri~~„~~/°" <br />Estimated total acres to be affected in the next report year:i y <br />
The URL can be used to link to this page
Your browser does not support the video tag.