My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP40589
DRMS
>
Back File Migration
>
Report
>
REP40589
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:32:23 AM
Creation date
11/27/2007 8:46:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Report
Doc Date
3/11/1994
Doc Name
SUBSIDENCE MONITORING REPORT JUL-DEC 1993 CYPRUS EMPIRE EAGLE MINE 5 E-SEAM WORKINGS
Permit Index Doc Type
SUBSIDENCE REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_t <br />4.2 Angle of Draw <br />Peng' notes that: <br />The angle of draw is more or less of academic interest because the <br />subsidence profile levels off and subsidence becomes very small far before <br />it reaches the edges of the subsidence basin and from surface structural <br />damages point of view, it is in practice meaningless. <br />With this caveat, the calculated draw angles are summarized in the following table. There <br />were no changes in the calculated angles of draws. It should be noted that these are <br />preliminary calculations. <br />Monitoring Line, Calculated <br />Gateroad, Angle of Draw <br />and Panel Ribside {degrees) Notes <br />A-Line 45.6 Point is located in a <br />1 East Headgate Gateroad plowed field. This <br />Panel 2 East Ribside probably has impacted the <br /> resulting draw angle <br /> calculation. <br />B-Line 19.7 Point is located in a <br />1 East Headgate Gateroad plowed field. This may <br />Panel 2 East Ribside have impacted the <br /> resulting draw angle <br /> calculation. <br />B-Line 1.5 Point is located in a <br />2 East Gateroad plowed field. This may <br />Panel 2 East Ribside have impacted the <br /> resulting draw angle <br /> calculation <br />J-Line 20.4 <br />2 East Gateroad <br />Panel 2 East Ribside <br />S-Line 16.5 <br />1 East Tailgate Gateroad <br />Panel 1 East Ribside <br />`Peng, <br />for Mininq, <br />page 10. <br />Syd 5., 1992, Surface Subsidence Engineering, Society <br />Metallurgy, and Exploration, Inc., Littleton, Colorado, <br />
The URL can be used to link to this page
Your browser does not support the video tag.