My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP40569
DRMS
>
Back File Migration
>
Report
>
REP40569
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:32:11 AM
Creation date
11/27/2007 8:46:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Report
Doc Date
2/5/1987
Doc Name
BLUE RIBBON MINE QUARTERLY BENCH MONITORING AND BENCH FINAL CONTOURS FILE NO C-81-047
From
MLRD
To
BLUE RIBBON COAL CO
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br />ii iii ii iiii iii ui ii <br />999 <br />STATE OF COLORADO <br />Roy Romer, Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />February 5, 1987 <br />P.O. Box 1352 <br />Palisade, Colorado 81526 <br />Re: Blue Ribbon Mine, Quarterly Bench Monitoring and Bench Final Contours, <br />File No. C-81-047 <br />Mr. Jim Stover <br />Blue Ribbon Coal Company <br />Dear Mr. Stover: <br />We have received and reviewed the 4th quarter bench monitoring results and the <br />mine bench final contour survey results. We are concerned about the increase <br />in the water level of piezometer P-1 which occurred this past fall. A few <br />more quarters of monitoring results should allow us to determine if a problem <br />is developing. <br />The proposed regrading of the ditch should eliminate problems with ponding <br />within the ditch. However, it is unclear exactly how ponding on other areas <br />of the bench is to be eliminated and how materials to be moved and <br />redistributed will be handled. Therefore, we are requiring that Blue Ribbon <br />Coal Company submit a more detailed regrading plan: The plan should delineate <br />bench top areas for excavation, cover material stockpiling, excess material <br />disposal, and regrading. The plan should also address whether deepening of <br />the ditch will expose gob material. If so the plan should include a proposal <br />for removing cover material, over-excavating the ditch profile, and then <br />replacing the cover. This more detailed plan should include a topographic <br />plan map with a scale of 1"=20' of the project area. <br />Blue Ribbon Coal Company estimates that the regrading work will be done <br />mid-summer. We feel this is a realistic timeframe. However, should goat <br />weather conditions permit, work should be started earlier. Timely <br />certification of the regrading work will be required upon its completion. <br />If you have any questions, feel free to call. <br />Sincerely, <br />/~'}~ <br />Susawr I ' <br />y <br />Reclamation Specialist <br />SJM/vj r <br />7311E <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203-2273 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.