Laserfiche WebLink
Wright Group Annual Report <br /> The Wright group is in phased reclamation. The surface area was inspected but no reclamation occurred <br /> during the past year. Attached is a map showing the permit affected area. Most surface structures and <br /> portions of the power lines have been removed, and mine portals and vents were closed in 1997. <br /> Reclamation is not planned for this coming year. Umetco is in the process of transferring the permit to <br /> Cotter Corporation. <br />