My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP40519
DRMS
>
Back File Migration
>
Report
>
REP40519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:31:06 AM
Creation date
11/27/2007 8:45:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
10/18/1996
Doc Name
BOWIE RESOURCES LTD BOWIE 1 MINE QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT 3RD QTR 1996
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • III IIIIIIIIIIIIIIII <br />• <br />Bowie Resources Ltd. <br />Bowie #1 Mine <br />Quarterly Waste Disposal Area Inspection Report <br />3rd quarter of 1996 <br />ttem <br />• <br />Yes/No <br />Cammerds <br />1 Quantity of waste material added to waste disposal Yes Approrimatey 1700 cu/yds. of gob was added to the <br /> area during reporting period. waste disposal pile during reporting period. <br />2 Waste material deposited and compacted in Yes Waste material was deposited and compacted <br /> 24 inch lilts? during this quarter in 2, 24 inch IiR <br />3 Drainage alterations eonstructed7 Yes Drainage alterations were constructed during this <br /> quarter. Drainage located on east side o(pile has <br /> been altered as per Technical Revsion #25. <br />4 Present height of waste material? Highest height appro>amatey 99 feet <br />5 New bench constructed? No <br />6 Refuse material ouL5lopes placed at 1 V:2V ouWopes? Yes Slopes were checked for proper placement <br /> periadicalty during construction. <br />7 Adequate drainage on tap of completed fill? Yes Grading was maintained on top of completed fill IiRs <br /> to ensure proper drainage from top of pile. <br />8 Bench drainage adequate? Yes Bench drainage was maintained throughout the <br /> quarter. See ltem 3. <br />9 Outslopes covered wlth 4 toot non-to~dc, Yes Outslopes have been covered witir approrimatety <br /> noncombustible material? 4 feet of non-toric, noncombustible material dudng <br /> this quarter. <br />10 Berms constructed on outslopes? Yes <br />11 Evidence of slnrcRrral defects? No <br />12 Topsoil adequatey savaged and stored? Yes Topsoil has been salvaged from pile during this <br /> quarter. <br />13 Trash removed? Yes Trash was removed prior to compaction. Two new <br /> lifts added this quarter. <br />14 Additional comments? No Parliane d rechnipl Recision n5 haw been campleled. <br /> Wecr side drainage has nN Yet been conshucled. <br />I certify the above report as being accurate to the~bestpof my knowledge. <br />- - - <br />Signature <br />Date <br />oRrcoexis entree <br />
The URL can be used to link to this page
Your browser does not support the video tag.