My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP40498
DRMS
>
Back File Migration
>
Report
>
REP40498
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:30:24 AM
Creation date
11/27/2007 8:45:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
4/1/2004
Doc Name
1st Quarter 2004 West Pit Fill Inspection Report & Certification
From
Knight Piesold & CO
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Knight Piesold <br />CONBU LTING <br />March 31.2004 <br />For: File <br />Re: Colowyo Coal Company L.P. (C-81-019) <br />West Pit Fill Inspection Report and Certification <br />First Quarter, 2004 <br />West Pit Fill Construction Report <br />During the quarter beginning January 2004 and ending March 2004, I inspected the area in which <br />the West Pit Excess Spoil Fill is being constructed. The purpose of these inspections was to <br />inspect the fill surface for vegetative efforts, inspect the fill for areas of water seepage or surface <br />drainage, and satisfy the requirements of CMDG Rule 4.09.1(1 la). <br />During the quarter, no progress was made on the West Pit Fill. No overburden was hauled to <br />backfill in the West Pit due to spoil room constraints. No sloping to final grade occurred. No <br />reclamation seeding was done during the quarter. No seepage was evident in the surface drain or <br />underdrain during the quarter. <br />Attached to this report is my certification that all construction requirements have been met thus <br />far in constructing the West Pit Excess Fill. <br />~~ <br />aye T. Pickarts, P.E. <br />Senior Project Manager <br />xc: Mr. Crellin Scott, Colowyo Coal Company, L.P. <br />West Pit Fill Construction Engineering Report <br />cf 4.5.2 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.