Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />BATTLE MOUNTAIN GOLD COMPANY ~lr~•~IttCfl <br />~ ~~ <br />JUN ~ 3 1996 <br />May 31, 1996 <br />Division of Lvnerais d~ U <br />fl4iRE MOUNNWN <br />GOLD COMPANY <br />Mr..lim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 21~ <br />Denver, Colorado 80203 <br />Subject Battle Mountain Resources, Inc. DMG Permit No. M-88-112 <br />Quarterly and Bi-weekly Sampling - April 2, 10, 22, 24, and May 8, 1996 <br />Dear Nlr. Dillie: <br />Enclosed are the analytical reports from Care Laboratories for the quarterly and bi- <br />weelay sampling periods collected April 3, 10, 22, 24, and May 8, 1996 as specified in <br />the April 1992 Abatement Plan. The cross-reference table between sample identification <br />numbers and sample locations is attached. As specified in TR-006, calculated free and <br />wad cym3ide values for the process point samples are enclosed. <br />The groundwater wells (M-9, ). RS-I, and RS-5, and the process points were sampled <br />and the analyses are enclosed. M-6. A4-7, M-8, RS-4, RS-6, and the three lysimeter pairs <br />were checked and found to be dry. Duplicate was collected a[ RS-l. Field and rinse <br />blanks were collected as part of the QA/QC. <br />Sincerely, <br />.~~~~ J~« <br />Kathleen Valdez <br />Environmental Technician <br />Enclosures <br />cc: Anne Baldrige <br />Dan Robertson <br />P.O. BOX 310 SAN LUIS, CO 61152-0310 (719)672-3362 EXT. 39 FAX (719) 672-3363 <br />