Laserfiche WebLink
~,. <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />COPY <br />Mine: Southfield Mine <br />Waste Bank MSHA ID. Nc Primary Refuse Disposal Area <br />inspection Period: Second Quarter 2004 <br />Inspection Date: June 29, 2004 <br />General Description or Reference to Site Plan: <br />The refuse area lies west of the main facilities area. Refuse has been placed in designed lifts <br />on a relatively flat terrain. Upslope runoff is diverted away from the disposal area, while runoff <br />from the tlisturbed area is channeled to a sediment control pond. The majority of the refuse <br />disposal area has been reclaimed previously and exhibits good vegetative growth. The mino is <br />now in final reclamation and the all remaining disposal areas have been sloped to final grade, <br />covered with topsoil, and seeded. <br />Activity During Inspection: <br />The area was idle at time of inspection. All areas have been regraded to final contour and covered <br />with subsoil and topsoil material. Remaining disturbed areas were seeded with the approved <br />reclamation seed mis in late fall of 2003. In most areas germination has been good to excellent. <br />Shrub plantings were noted in several areas. No problems wish erosion was observed. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction andlor <br />discharge, integrity of 100-year 24-hour drainage structures, and evidence of positive drainage). <br />No springs or seeps were observed on the refuse surface. Positive drainage has been maintained <br />on the reclaimed areas. Drainage and diversion structures were intact. All required underdrain <br />construction has been completed. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />No refuse placement has occurred since December of 2000. Prior to cessation of mining, waste <br />material was placed in alternating lifts of floe and coarse material in accordance with the plan as <br />described in the TerraMatrix report dated December 5, 1996. <br />