My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP40447
DRMS
>
Back File Migration
>
Report
>
REP40447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:29:57 AM
Creation date
11/27/2007 8:44:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Report
Doc Date
7/10/2002
Doc Name
Responses to 6/12/02 DMG Review Letter
From
Peak Project Managment
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.; .~ <br />RECEIVED <br />INSPECTION OF EXCESS SPOIL FILL <br />Fill Area #7 <br />First Quarter 2002 Certification <br />February 23, 2002 <br />JUL ~ 4 2002 <br />IlitnSion of Minerals d Geology <br />The CTL Thompson report dated April 27, 2001, "StabiliTy Analysis and Geotechnical Recommendations <br />Lorencito Surface Mine Phase I" addresses the general requirements as also cited in Sections 4.09.1 to <br />4.09.2 of the Colorado Mined Land Reclamation Board for Coal Mining. <br />ACTIVITIES NOTED DURING INSPECTION <br />Removal of organic material and topsoil salvage; ongoing fill placement <br />SEDIMENT CONTROL <br />Sediment pond construction has been completed in accordance with plans submitted to and approved by <br />the DMG and as-constructed survey/drawings certified by Registered Land Surveyor and Registered <br />Professional Engineer. All surface run-off from the fill areas is directed [o this sediment control facility. <br />SITE PREPARATION <br />Organic materials such as brush and trees have been removed from the proposed fill area. Topsoil has <br />been stripped from the area and stockpiled. <br />No evidence of springs or seeps was observed during site preparation. <br />DRAINAGE SYSTEM (UNDERDRAINS) <br />Underdrain construction was completed in advance of fill placement. <br />FILL PLACEMENT <br />CDMG regulations require that spoil be "placed in horizontal lifts in a controlled manner, concurrently <br />compacted as necessary to ensure mass stability". Maximum lift thicknesses are not specified. Lifts are <br />being placed in accordance with plans specified by the CTL Thompson report. <br />Spoil material is transported to the fill area using a combination of [rocks and dozers. Lift thicknesses <br />varied but were not in excess of 50 feet in thickness. Spoil placement was in excess of 50 feet from the <br />projected final fill face. <br />COVER MATERIAL <br />Final fill configuration has not been obtained and no cover material has been placed on the spoil material. <br />
The URL can be used to link to this page
Your browser does not support the video tag.