My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-17_REPORT - M1986015
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1986015
>
2003-12-17_REPORT - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:39:18 AM
Creation date
11/27/2007 8:43:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
Report
Doc Date
12/17/2003
Doc Name
Annual Fee/Report/Map
From
Continental Materials Corporation
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pueblo East Pit <br />2003 Annual Report <br />Transit Mix of Pueblo <br />M-1986-015 <br />Overview pf Permit Year: During; the }'ear the redamatinn pcrnut vas amended. <br />'three hundred seventy' acres were added to bring the total permitted acreage up to <br />43250. \liningt has continued steadily tivcsavard and previous tt~tter supply issues <br />with an adjacent landowner have been resolved. <br />Annual Report Map: '1"wo maps are being submitted with this year's annual <br />report. A general site map is included along with the annual report map. The annual <br />report map this yezr differs from last }'ears map in that all of phase one can he seen. <br />Activity: iitining and material cstracoon has progressed steacL7}' westward in the pit. <br />\~/ith the passage of the amendment Transit i`•lix was able to push through the <br />previous pernut boundu}', a former drninagc ditch ntnning north-south through the <br />pmpcrey, 'the plant site has expanded southward b} three acres, ddditiona] <br />stockpiling room was needed to accommodate the new plant. 'll~e berm adjacent to <br />the haul road parallel with the zrver was raised in elevation. Springtime flooding,,s were <br />higher th.1n anticipated. The new sediment basin teas rcbuile sa that a larger volume <br />of sediment could be contained. <br />Revegetation: Because miciing; is in its bcg*inning stages no zevcgetation has taken <br />place yet. 'T'ransit i`lix plans on seeding « ~psoil stockpiles in 20f><3. <br />Expected Activity: \dining wilt continue ro push westward. Phase 1 null most <br />likely last nva years. '1"his ameframr ulrimatch• hinges on the market and the quality <br />of the deposit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.