Laserfiche WebLink
<br />AVERY STRUCTURES, INC. <br />1984 ANNUAL REPORT <br />PERMIT N0. 79-10 <br />Submitted herewith is the Annual Report for Permit No. 79-10 <br />including Drawing No. CPI-1-84, No significant acts <br />relating to the reclamation plan were accomplished during <br />the year. However, several hundred yards of concrete debris <br />and large boulders have been stockpiled by permission of the <br />Town of Buena Vista at the south side of the pit. This <br />material will be placed in the south end of the pit 1n early <br />February 1985 (please see attached Drawing No. CPI-1-84). <br />Other information as requested is as follows: <br />1. Location and number of acres affected during 1984: <br />3.27 acres (as indicated on Drawing <br />No. CPI-1-84) <br />2. Location and number of acres reclaimed during <br />1984: <br />None <br />3. The location and number of acres in the various <br />stages of reclamation (backfilled, graded, topsoil <br />replacement, revegetated): <br />none has been reclaimed. The area that has <br />been filled in 1982 and 1983 presently is <br />where the stockpile of topsoil material that <br />the Town of Buena Vista brought in that will <br />eventually be used for reclamation of the pit <br />site. <br />4. The species of vegetation planted, the locations <br />and approximate dates of planting: <br />None <br />