Laserfiche WebLink
Table 4 <br />Groundwater Monitoring Program <br />• <br /> <br /> Water Quality <br />Station Water Level Field Parameters' Lab Analyses' <br />Wells Monitoring Drainage from Refuse Piles <br />RPE-1 3times per ycar 3times per year Annually <br />GPfi 3 Times per year 3times per year Mnually' <br />GP-7 3times per year 3times per year Mnuallyr <br />GP-3 (A'tW-B) 3times per year 3times per year Annuallyr <br />GP-0 (MW9) 3times pcr year 3times per year Mnually? <br />GP-5 (MW-3)' 3times per ycar 3times per year Annually <br />Wells Completed in the Barren Member Above the F Seam <br />B•32' 3times per year 3times per year Mnually <br />SOM-13 3times per year 3times per year Mnually <br />SOM-38-H-I' 3 limes per year 3 limes per ycar Mnually <br />SOM-05•H-1 3times per year 3times per year Annually <br />SOM-05-H-2 3times per ycar 3times per ycar Mnually <br />SOM-80 3times per year 3times per year Annually <br />SW-I 3 Times pcr ycar 3times per year Annually <br />SW-2 3times per year 3times per year Mnually <br />SW-3 Slimes pcr year 3 limes per ycar Mnually <br />SW-0 3 limes per ycar 3 limes per year Annually <br />S W-5 3times per year 3times per year Annually <br />SW6 3times per year 3 limes per ycar Annually <br />Wells Completed io the "F" Seam <br />SOM-C-76 3times per )•ear 3times per year Annually <br />SOM-2•H 3 limes per year 3times per year Mnually <br />SOM-16-H 3 limes per year 3times per year Annually <br />W alto Completed in or above the "E" Seam <br />96-2-2 3times per year 3times per year Mnually <br />96-27-I 3times per year 3times per year Annually <br />SOM-23-H•2' 3times per year 3times per ycar Mnually <br />Wells Completed in or above the "B" Sam <br />C-72-H 3times per year 3 limes per ycar Annually <br />1MB-12' 3times per year 3times per year Mnually <br />RAV-0b 3times per year 3times per year Annuafly <br />SOM-23-H•1' 3times per year 3times per year Annually <br />SOM-129-H 3times pcr year 3times per year Annually <br />SO. W-1 3times per year 3times ptt year Mnually <br />Wells Completed in the Rollins Sandstone <br />LP-I' 3times per year 3 limes per year Mnually <br />SOM-128-H 3times per year 3times per year Mnually <br />SO.W-3 3 limes per year 3times per ycar Annually <br />' Field parameters include pH, conductivity, and temperature. <br />1 Annual analyses during the third sampling period include laboratory analyses of pH, conductivity, total dissolved solids <br />(TDS), calcium, magnesium, sodium, SAR, hardness, bicarbonate, chloride, unionized ammonia, nitrate/nitrite, phosphate <br />(POq-3 as P), sulfate, iron (total and dissolved), manganese (total and dissolved), arsenic, cadmium, lead, mercury, <br />selenium and zinc. All parameters were analyzed for their dissolved forth unless stated otherwise. <br />• 7 I(water is present, samples will be obtained three times per year for laboratory analysis of TDS, Fe, and Mn. <br />' Monitoring was discontinued per Technical Revision No. 85, approved July 21, 1998. <br />C:\-Project Files\871-0J21500jmk\1998 AFill\Teble d.doc <br />