Laserfiche WebLink
Holcim <br />Ms. Tawnya Deherrera <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />September 26, 2005 <br />RE: Slab Canyon Limestone Quarry: Permit # M-1977-347 <br />Dear Ms. Deherrera: <br />RECEIVED <br />SEP292~ <br />Division of Minerals and Geology <br />Attached is the Annual Report and a check in the amount $688.00 for the Slab Canyon <br />Limestone Quarry. The fee is for the reporting period October 10, 2004 to October 10, <br />2005. <br />There has not been any activity at this site during the reporting period other than <br />reclamation monitoring. There currently are no plans to resume operations in the near <br />future. <br />A copy of the letter of credit is attached as per the requirements of 2CCR 407-1, 407-4 <br />and Rules 1.15(1) (a). The letter of credit is for $184,819 which is sufficient for current <br />reclamation requirements. Holnam, Inc. changed its name to "Holcim (US) Inc on <br />December 12, 2001. The amendment to the letter of credit reflects this change. <br />If you require additional information or clarification please contact me at the above <br />address and or phone number, or by a-mail at oordon.benton(o~holcim.com, <br />Yours sincerely, <br />Gordon Benton, Project Manager <br />Attachments <br />cc: Kathy Shanteau <br />Todd Richards <br />Holcim (USj Inc. Phone 970 482 4065 <br />Building C Faz 970 482 1363 <br />4629 N. Overland Trail www.holcim.com/us <br />P.O. Boz 1548 <br />LaPorte, CO 80535 <br />Strength. Performance. Passion. <br />