Laserfiche WebLink
ANNUAL REPORT <br />Operator: <br />Location: <br />File Number: <br />Anniversary Date: <br />United Companies of Mesa County <br />Berry Pit <br />M-1977-132 <br />January 16, 2005 <br />The Berry Pit was active this past report year. No crushing took place but our portable <br />asphalt plant did move in near the end of August and produced approx. 30,000 tons of <br />HBP (Hot Bituminous Asphalt). We used our existing stockpiles and imported a small <br />quantity of material from another source in Meeker to produce the mix. <br />The enclosed sketch shows the approx. location of existing stockpiles. This year our <br />weed management program will include this location. The pit does not have much of a <br />weed problem and we want to keep it that way. I believe this is partly due to the high and <br />dry location and the few horses and cows that either trample or snack on what little does <br />grow. ' <br />Sincerely, <br />Brent W. Kerr <br />Resource Manager <br />January 14, 2005 <br />