Laserfiche WebLink
r <br />Colowyo Coal Company, L.P. <br />5731 State Highway 13 <br />/~Kennecott <br />Meeker, CO. 81641 / <br />- <br />(970) 824-1570 ~ ~ Energy <br />(970) 824-1598 '~-\ <br />l <br />C <br />C <br />f C <br />Stephen R. Hinkemeyer <br />o <br />owyo <br />oa <br />ompany L.?. <br />Technical Services Manager <br />FOR: File April 11, 2003 <br />West Pit Fill Construction Report <br />During the quarter beginning January 1, 2003 and <br />ending March 31, 2003, I inspected the area in which the <br />West Pit Excess Spoil Fill is being constructed. The <br />purpose of these inspections was to inspect the fill " <br />surface for vegetative efforts; inspect the fill for areas <br />of water seepage or surface drainage and to satisfy the <br />requirements of CMDG. Rule 4.09.1(lla). <br />During the quarter no progress was made on the West <br />Pit Fill. No overburden was hauled to backfill in the West <br />Pit due to spoil room constraints. No sloping to final <br />grade occurred. No reclamation seeding was done during the <br />quarter. No seepage was evident during the quarter <br />Attached to this report is my certification that all <br />construction requirements have been met thus far in <br />constructing the West Pit Excess Fill. <br />~.r~ll/ ~ L?~ <br />Stephen R. Hink eyer <br />Technical Services Manager <br />Cc. West Pit Fill Construction Engineering Report <br />Cf 4.5.2 2003 <br />