Laserfiche WebLink
DIVISION OF MINERAL AND GEOLOGY <br />DEPARTMENT OF NATURAL RESOURCES <br />1313 SHERMAN ST. ROOM 215 <br />DENVER, COLORADO 80203 <br />RE: ANNUAL REPORT FOR PERMIT #. M 2000-1 I S PINO PIT <br />I. AS OF THIS DATE EROSION CONTROL BERMS HAVE BEEN PLACED AS <br />SHOWN <br />2. ALL TEMP GRADING OF THE SITE IS COMPLETED AND ALL TOPSOIL HAS <br />BEEN REPLACED. <br />3. THE AREA HAS BEEN SEEDED WITH A BLEND CONSISTING OF 30% <br />CLOVER, 20% CRESTED WHEAT, 20% WESTERN WHEAT, 15% DRYLAND <br />BROM AND I S% GRAMA ON SIX INCHES OF REPLACED TOPSOIL THAT WAS <br />STOCKPILED DURING THE MINING OPERATION. ROADWAYS THAT WERE <br />DISTURBED HAVE BEEN PLATED WITH SANDY LOAM MATERIAL AND <br />THEN TOPSOILED. <br />4. GROWTH FOR THE 2002-03 SEASON HAS BEEN NON EXISTENT DUE TO <br />THE DRY CONDITIONS. <br />5. THE FINANCIAL WARRANTIES SUPPLIED BY US AND THE LYNDEN /HI2H <br />COMPANY ARE STILL IN EFFECT. <br />IF THERE ARE ANY QUESTIONS, PLEASE CONTACT OUR OFFICE. <br />SINGLY, <br />~l `~ G~t*~n~ <br />DG HUSKIN CONSTRUCTION CO. <br />-_~~,.. <br />