Laserfiche WebLink
• <br />ANNUAL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 34-32-1 l6(3), and C.R.S. 34-32.x-116(3)(a), on the anniversary date: of the permit each year, <br />the operator shall submit a report and a map showing the extent of curtent disturbances to affected land, <br />reclamation accomplished [o date and during the preceding yeaz, new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such <br />a report and map to ~:nclosed annual report form. (An adequately labeled map that clearl~i delineates and includes <br />Che above elements may suffice for a written report.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407-4, and Rules <br />1.13.7(1)(a): <br />(I) [he condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comph with reclamation, <br />performance standards and Environmental Protection Plan requirements, if they are part of your <br />approved application: and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 3 CCR 407-1, 407, and Rules l.ld(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(I) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.1 ~(1)(a), provide an updated <br />statement regarding the sufficiency of the ca]ue of the financial warranty. Specifically, <br />irrevocable letters of credit. Deeds of Trust, and security agreements, self-insurance, salvase <br />credit. and first priority liens on project related Fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.1~(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update. by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security Agreement, <br />and the value of the property subject [o either of these instruments. <br />The report shall also provide proof that there are no past-due property taxes. <br />(iiij Frr die requirements of 2 CCR =307-1.407-4, and Rules -1.7i 3), permits secured with an <br />Irrevo-able Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certi5ed by a Certified Public Accountant, demonstrating that the <br />Lever of Credit does not exceed ten percent (10%) of the bank's capita] surplus accounts. <br />(vi) Fer the requirements of Z CCR 407-1, 407-4, and Rules 4.9.3(c). permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail io fully describe the condition, value, and location of al] pledged fixtures <br />and equipment. <br />(b) Per the requirements of 2 CCR 407-1.407-4, and Rules 1.15(1)(c), all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. <br />(Please note that if you are not a Designated Mining Operation, you will not have an Environmental <br />Protection Plan as part of your approved permit.) <br />