Laserfiche WebLink
~. ' <br /> <br />CANYON SAND AND GRAVEL ANNUAL REPORT FOR 2007 <br />In 2006, Canyon Sand and Gravel had an engine go down for the <br />main crusher in early July. A new Detriot engine had to be specially <br />built and was not completed and installed anti! November of 2006. <br />The Annual Report for 2005 gave the information of the only <br />excavation and reclamation until materiats excavation in July of <br />2007. The excavation from 2005 was crushed early in 2006 and the <br />new engine was tested in November of 2006, however Canyon Sand <br />and Gravel is only open May until 1V-ovember tiecause oflocation in - ~ - <br />the National Forest on an unmaintained road that roses seasonally, <br />so there was no new excavation necessary and the reclamation <br />around the Lake/Pit area was completed in 2005. <br />In July of 2007, the avsher plant was moved from the °island" <br />where it has been since we started, to the new 110 permit area. Now <br />the new raw material piles are at the north and south ends of the <br />small land mass upon whicth the kxusher has been located, in the <br />same locations they have been in alt of the previous years, but the <br />island is smaller. Essentialty fast year 2006, there were no changes <br />or progress at Canyon Sand and Gravel. This year the crusher is set <br />up just outside of the lake/pit area in the stockpile area of our <br />amended addition to the original <br />plan. <br />Next year the gravel pit should be finished, and the crusher ready <br />to be sold by the end of the 2008 season, a year later than we <br />expected in 2007. A topsoil burro at the north end of the pemTit area <br />and a topsoil pile arse on site for the redamation of the current <br />stockpile/crusher area. They wilt be used to tecaim that area to <br />pasture when the crusher is sold. We exiled to be completed in <br />2009. <br />