Laserfiche WebLink
iii iiiiiiiiniu iii <br />999 <br />QUARTERLY INSPECTION REPORT <br />COAL WASTE BANKS <br />Rules 4.09(11) and 4.10(2)(2) <br />Mine: NL°W ~~.~' <br />Date: <br />Waste Bank No: IC/JJT <br />General Description or Reference to Site Plan; <br />^ Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25 (a) through (c) <br />I~New Elk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surtace Drainage System <br />^ Placement of Underdrain(s)' <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-year 24-hourappurtenant drainage structures, evidence of positive <br />drainage. <br />~p(7~v~oD+~,q~cr Ml°~Svriy~,~7`S c~o Ao7` inc~c4~e 9/o~ho/r,.a~T <br />bu~l~u(' ;n ~e /'e -,use (~~ T//bi/r~~~ .Se~f~.~// ~„~cs ~t <br />Dbse~v~d %/~ /7e SM4lI S~4M/~ 4~G 7~G 7~ir~ L~m~i. <br />Observations of Fill Construction: Include tlescription of material, compaction, lift thicknesses, <br />slopes of sides an/d facce',s,,,cons/tr)uction methodology. / <br />S~~r4/ ~-(q!l ~~MI P~I~S t~t~ D~j..se/Lt•~ o~^ <br />~~~ UPPe~ l~~/ <br />Sob No. 28,170 Page L of 2 <br />