My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP39712
DRMS
>
Back File Migration
>
Report
>
REP39712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:27:16 AM
Creation date
11/27/2007 8:31:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Report
Doc Date
7/20/1984
Doc Name
SNOWMASS COAL CO REFUSE DISPOSAL SITE CHECK SHEET
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. ~ - i • III IIIIIIIIIIIII III <br />SNOWMASS COAL COMPANY <br />REFUSE D15POSAL SITE CHECK SHEET <br />ITEM vnc .... CO?MENTS , <br />1. Coal refuse de osited in 24" lavers <br />2. Each laver is compacted to at least <br />90X maximum dr den sit x <br /> New road not installed yet, <br />3. t'-Ditch D-9 installed therefore permanent ditch no <br />a. Slope X installed <br />b. Ditch linin "faterial x <br /> _ _ _ <br />Rip Rap questioned in April <br />4. V-Ditch D-10 installed. 18, 1984, inspection report. <br />a. Slope X Design is for 12" rip rap. <br />b. Ditch lining rlacerial The installed rep rap approx <br /> x imately - 12" pit run, <br />5. Height of refuse material since last <br />bench (If 40' CONSTRUCT BENCH!) 25' ft. x <br />6. Bench being constructed. __ Not being Constructed <br /> Tighter survey control sug- <br />7. Refuse material outslope is 24° or gested to avoid lesser slope: <br />1V: 2~ N Afaximun x <br />8. Bench width is 20 feet x <br /> #1 bench may need slight <br />9. Bench slope is back towards refuse pile at grading when old road filled <br />ll': 20 H Minimum. x <br /> #1 & #2 bench drain to D-10 <br />10. Benches are pitched towards either side to but will slope both directia <br />divert runoff to ditch D-9 or D-10. en road filled. See below <br />11. Completed outslopes and benches are covered <br />with at least 4' of nontoxic, noncombustible <br />material includin an ade uate to soil laver, x <br />]2. Evidence of anv structural defects.* x * If ves see co~mnents below <br />13. Topsoil from previously undisturbed areas <br />bein salva ed ade uately. x <br />14. Trash and other debris being separted ~ <br />from coal refuse.. <br /> x <br />15. Additional comments or observations <br />#3 Bench level in center-needs to be graded towards D-10. <br />Access cut off of #3 Bench needs regrading. <br />Clean more gravel out of spillway or backfill east end on refuse dam <br />,. <br />I hereby certify that the inspection of the refuse disposal area was done under my <br />iireet supervision and is constructed as per the current Colorado Hined Land Reclamation <br />Permie requirements. First Quarter 1984 <br />)ate S = 9- 8~ <br />Si y,~ a,~ <br />RECEIVED <br />urea, <br />JUL 201984 ~~ <br />~. <br />MINED lANO RECLAMATION DIVISION <br />Colo. Dept of Natyral Resources <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.