Laserfiche WebLink
' 0 01101001�01��0�0 AID o �/�3�� <br /> 999 GENERAL OFFICES AND PLANT <br /> Qdorgimv FRIE0 a S®WM S9 0136' 11521 BRIGHTON ROAD •HENDERSON.COLORADO 80640 <br /> SAND ARO GRAVEL (303)289-1837 <br /> (303)289-2865-FAX <br /> RECEIVED <br /> NDL D HD AIN 3 0 2000 <br /> June 26, 2000 Division of Minerals&Geology <br /> Mr. Carl Mount CERTIFIED RETURN <br /> Division of Minerals and Geology RECEIPT REQUESTED <br /> Minerals Section ITEM #70993220000376539360 <br /> 131 Street Suite 215 <br /> Denver, Colorado 80203-2273 <br /> Dear Mr. Mount: <br /> Re Albert Frei and Sons, Inc, <br /> Walstrum Mine, M.L.R. Permit <br /> No. M-83-033, Annual Report <br /> FEDERAL TAX ID# 84-0517799 <br /> Our files indicate that the anniversary date for this <br /> permit is June 23. This pit HAS NOT been granted a Temporary <br /> Cessation and it HAS operated more than 180 days this year. The <br /> Financial Warranty for this operation is $75,000, the permitted <br /> area is 125 .88 ac. ± and the pit is divided into 7 Reclamation <br /> Phases. A sign that conforms with rule 6.7 Signs and Markers is at the <br /> entrance to the quarry on the scale house. Please refer to the <br /> Annual Report Map for the location of areas discussed in this <br /> report. This is a quarry operation, as a result we remove large <br /> amounts of material without disturbing large areas of land. <br /> We will deal specifically with each of the Annual Report <br /> requirements as outlined in Rule 1. 15 of the Rules and Regulations, <br /> and the annual notice letter. <br /> ( 1) Mining continued on the area previously stripped in Phase I, <br /> this includes the floor area (green) , and the working face <br /> (brown) . Total disturbance to date in Stage I is 29. 70 acres <br /> ± . We mined deeper along the face this year lowering benches <br /> but creating little or no floor area. The current face area <br /> has changed little from last year and covers approximately <br /> 4 . 77 acres ± (brown) . The floor of the mine is on three <br /> levels; the first is the level near the scale; the second is <br /> approximately 60 feet higher and the third is near the face <br /> and is another 30 feet above the second. The scale house <br /> level is the final level of the mine floor. The other two <br /> benches will be lowered as mining progresses into the prop- <br /> erty. The upper two benches were left to accommodate the <br /> processing equipment so the mine would work more efficiently. <br /> We have also begun to daylight thru the drainage where <br /> backfilling was taking place. <br />