Laserfiche WebLink
As approved by the DMG, water continued to be transported from the evaporation system <br />collection pond to the tailings impoundment via water truck. The total volume moved during the <br />month of November was 1,860,000 gallons. <br />The five flow window wells were all operating at month's end. These five wells are M-18, M-19, M-20, <br />M-28 and M-29. The combined flow from these wells was approximately 99 gpm. <br />Si~ rely, <br />Ron Zu alt <br />Enclosures <br />cc: Bill Lyle <br />DanRoberfson <br />File <br />