Laserfiche WebLink
January 24, 2006 <br />In 2005 no mining was done some top soiling has continued Reclamation has not started <br />on the pit floor, as we still need this room for stockpiles. <br />Topsoil will continue to be stockpiled to t~East~ oN rth si of the pit. Some <br />re sloping and top soiling should begin in the fall of 2006 if we continue to move forwazd <br />enough in the pit to open up enough floor space. <br />In 2006 we should mine between 1 to 2 acre still moving to the North. The pit <br />will be open May to November in 2006. <br />