Laserfiche WebLink
~ i <br />4. HAUL OFF CONTAMINATED MATERI <br />millsite cost: D=6 cat $51.77/hr x 17 hrs <br />Dispose of 740 cu. yds of i <br />loader 8 hrs @ 34.70/hr <br />trucks 8 hrs @ 43.91/hr <br />cat\ hrs @'51.77/hr <br />cat and drill: $51.77 x 4 I <br />$50.00 drill rental <br />seed: 60 lbs @ $3.00/1 <br />plus <br />tailings disposal cost: ca 2 hrs to over trench and <br />to soil: <br />cat hr to seed site <br />seed: 10 bs @ 3.00/lb <br />total: <br />TOTALS <br />Reclamation cost: <br />Administration (25X): <br />Total: <br />Bond request should 1~ $6900 <br />_~ <br />~:_-~ <br />$880 <br />278 <br />351 <br />104 <br />257 <br />180 <br />104 <br />52 <br />30 <br />$zz36 <br />$5525 <br />1381 <br />$6906 <br />AND <br />Prepared by S.C. ~tewart, August 17, 1988 <br />