Laserfiche WebLink
<br /> <br /> <br />• The concrete batch construction site has been recontoured and <br />seeded with the approved seed mix. <br />• The test heap northwest of the mine has been stabilized by: <br />1. removing ore to plant; <br />2. ripping liner and burying in place; and <br />3. recontouring test heap area. <br />Exhibit "D" identifies a minor modification request slightly <br />altering the size and configuration of Waste Rock Disposal Area B. <br />The modification does not change the reclamation plan. If this <br />request constitutes a "Technical Revision," please process as <br />necessary. <br />Please call if you have any questions. <br />S~rG~,y'/ ~~,~~~,!'L~LU <br />Matt R. Lewis <br />Manager, Environmental Affairs <br />MRL/ps <br />cc: Gary Dodson <br />911028a <br />