Laserfiche WebLink
Colowyo Coal Company, L.P. <br />5731 State Highway 13 <br />/~Kennecott <br />Meeker, CO. 81641 / <br />~ <br />(970) 824-1570 ~ . Energy <br />(970) 824-1598 ~' <br />~o~a, <br />C <br />l <br />C <br />l C <br />L <br />P <br />°" <br />h <br />R <br />Hi <br />k <br />S o <br />owyo <br />oa <br />ompany <br />, <br />. <br />en <br />. <br />n <br />emeyer <br />tep <br />Technical Services Manager <br />FOR: File June 25, 2003 <br />West Pit Fill Construction Report <br />During the quarter beginning April 1, 2003 and ending <br />June 30, 2003, I inspected the area in which the West Pit <br />'- Excess Spoil Fill is being-constructed.- The purpose of`~---" <br />these inspections was to inspect the fill surface for <br />vegetative efforts; inspect the fill for areas of water <br />seepage or surface drainage and to satisfy the requirements <br />of CMDG. Rule 4.09.1(lla). <br />During the quarter no progress was made on the West <br />Pit Fill. No overburden was hauled to backfill in the West <br />Pit due to spoil room constraints. No sloping to final <br />grade occurred. No reclamation seeding was done during the <br />quarter. No seepage was evident during the quarter <br />Attached to this report is my certification that all <br />construction requirements have been met thus far in <br />constructing the West Pit Excess Fill. <br />-- <br />Stephen R. Hinkem er <br />Technical Services Manager <br />Cc. West Pit Fill Construction Engineering Report <br />Cf 4.5.2 2003 <br />