My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP39157
DRMS
>
Back File Migration
>
Report
>
REP39157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:24:59 AM
Creation date
11/27/2007 8:18:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
11/1/1995
Doc Name
PN C-81-038 3RD QTR 1995 REPORTS
From
BOWIE RESOURCES LIMITED
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Bowie Resources Limited <br />Bowie #1 Mine <br />Quarterly Waste Disposal Area Inspection Report <br />3rd Quarter - 1995 <br />Item Y N Comments <br />1. Quantity of waste material added to Approximately 1188 tons of gob was added to the <br />waste disposal area this quarts(? Y waste disposal pile this quarter. <br />2. Waste material deposited and Waste material was deposited and compacted during <br />compacted in 24• lifts? Y the quater in 2, 24• lifts. <br />3. Drainage alteratons constructed? No drainage alterations were constructed during the <br /> NA quarter. The existing drainage pattern was maintained <br /> around the perimeter of the pile to protect outslopes <br /> and direct drainage at the tce of the pile. <br />4. Present height of waste material? Highest height approximately99.0 feet. <br />5. New bench contracted? <br /> N <br />6. Refuse material outslopes placed at Slopes were checked for proper placement <br />1 V:2H outslopes? Y periodically during construction. <br />7. Adequate dranage on top of completed Grading was maintained on [op of completed fill lifts <br />fill? Y to ensure proper drainage from the top of the pile. <br />8. Bench drainage adequate? Bench drainage was maintained throughout the quarter. <br /> Y See Item 3. <br />9. Outsbpes covered with 4' non-toxic, Outslopes have been covered with approximately <br />non-combustible material? Y 4 feet of non-toxic, non-combustible material during <br /> this uarter. <br />10. Berms constructed on outslopes? <br /> Y <br />11. Evidence of structural detects? <br /> N <br />12. Topsoil adequately salvaged and No additional topsoil was salvaged from this pile <br />stored? NA this quarter. <br />13. Trash removed? Trash was removed prior to compaction. Two new <br /> Y lifts added this quarter. <br />14. Additional comments? <br /> N <br />I certify the above report as being accurate to the best of my knowledge. <br />O <br />Signature <br />/o -30 - 9S <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.