My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP39148
DRMS
>
Back File Migration
>
Report
>
REP39148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:24:53 AM
Creation date
11/27/2007 8:18:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981202SG
IBM Index Class Name
Report
Doc Date
11/27/1995
Doc Name
SILT PIT ANNUAL REPORT MLRB PN M-81-202 GARFIELD CNTY
From
FLAG RESOURCES INC
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIlillllllil III <br />sss <br />November 20, 1995 <br />.Flag rResources, lnc. <br />1412 County Read 311 <br />New Castle, CO 81641 <br />(303) 876-2397 - <br />Mrs. Barbara Chiappone <br />Division of Minerals and Geology <br />1313 Sherman Street, Suite 215 <br />Denver, Colorado 80203-2273 <br />Dear Mrs. Chiappone: <br />Re: Silt Pit, Annual Report, <br />MLRB Permit No. M-B1-202, Garfield County <br />~! <br />~F(',FIVFI ~ <br />j ~OV 2 ~ 1995 <br />of Nune~ais a GeuioyY <br />Our files indicate that the anniversary date for this permit <br />i <br />is November 27, 1995. We continued to mine in Stage 1 this year <br />working on an area disturbed in past years.This pit HAS NOT been <br />granted a Temporary Cessation and it HAS operated more than 180 <br />f <br />days this year. The Financial Warranty, as revised in 1994, for <br />I <br />this operation is $79,800, the permitted area is 170.70 ac. ± and <br />the pit is divided into 5 Reclamation Phases. As required in Rule <br />3.1.12 a sign has been installed at the entrance to the pit and the <br />i <br />boundary has been outlined to delineate the affected lands. <br />Please refer to the 1994-95 Annual Report Map; attached, for <br />locations of the areas discussed in this text. Welwill deal <br />specifically with the Annual Report requirements outlined in Rule <br />1.15 and the annual report form. <br />(1) Mining continued in the Stage 1 on area disturbed in previous <br />years. Stage 5 is still used as processing plant site and <br />contains gravel stockpiles, concrete casting beds and the <br />office facilities. Mining continued on 5.87 acres ± on the <br />western side of the property on an area previously disturbed <br />(cross-hatched). We have 15.50 acres ± of lake area (blue), <br />and 28.57 acres t stripped, ready for miningl(yellow). The <br />two topsoil stockpiles (brown) contain approximately 64,830 <br />YD' and covers 2.03 acres ±. The pit is dewatered at this <br />time, so the floor of the lake area can be mined. <br />(2) No reclamation was required this year. However we completed <br />reconstructing an additional 5.25 acres ± ofdwetlands (dark <br />green) on the south side of the property, bringing the total <br />reconstructed wetland area to 7.27 acres ±. ~We completed <br />rough grading of the slopes along the west side on the area <br />mined this year and resoiled the bank slopes with 946 YD' of <br />
The URL can be used to link to this page
Your browser does not support the video tag.