My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP39118
DRMS
>
Back File Migration
>
Report
>
REP39118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:24:41 AM
Creation date
11/27/2007 8:17:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
10/11/2002
Doc Name
3rd Quarter 2002 Refuse Pile Report
From
Northwest Colorado Consultants Inc
To
Twentymile Coal Company
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Refuse Pile <br />Location: Foidel Creek Mine <br />Client: Twentymile Coal Co. <br />Project No.: 99-3983 <br />Report No.: 8 <br />Date: 8/2102 <br />Time: 4.0 <br />Mileage: 50 <br />EngrJTech: BDL <br />Work Performed: <br />As requested, we visited the project site on this date and conducted nuclear density test No.'s 220 through 224 <br />on the material being placed in the refuse coal pile. <br />Twentymile Coal Company crews had scarified and re-compacted the processed waste coal in the failing areas in <br />Area 1 and Area 2 of the Refuse Pile. Is should be noted that no additional refuse material had been added since <br />our last visit on 6/26/02. We obtained a moisture sample at each test location and a bulk sample of the material <br />was obtained and delivered to our laboratory for checkpoint Proctor determination. The checkpoint matched <br />Proctor No. 3. <br />Remarks: <br />The material tested generally met project the project specifications for compaction. It should be noted that these <br />tests should be considered retests of the failing tests taken on 6/26/02. <br />We also observed that the waste coal materials were being stockpiled at the south end of Area #2 at the time of <br />our visit. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Dave Wallace was notified of today's test results. <br />
The URL can be used to link to this page
Your browser does not support the video tag.