Laserfiche WebLink
. ~,. <br />Florence Pit M-2001-070 <br />Mining Activity August 23, 2001-August 6, 2002 <br />I worked in the mine for fifteen days for approximately five hours per day. <br />Fill dirt was removed from the north. Some ofthis was backfilled to the north and the rest <br />was piled to the west. All ofthis was within the permit area. New excavations to remove <br />turquoise occurred under and to the south of the fill removed. <br />All activity was on the floor of the existing pit. No topsoil or vegetation was disturbed. <br />When the season is over (late September}, fill dirt will be replaced in any new excavations <br />remaining. <br />Next year the same procedure will be repeated in the area turquoise deposits are found. <br />The mining activity usually begins late May or June depending on the weather and my <br />availability to conduct the mining. This is a typical season for me. <br />The map shows where mining activity occurred. <br />RECEIVED <br />J~~~~~ G~ ~ AUG 0 72002 <br />lr~ pivisiaa of Minerals and fieotog~ <br />